Community heating phase 2 - installation of control equipment.

The Works comprise installation of heating control boards to approximately 5 500 properties. Internally the work comprises: Property surveys and asbestos surveys; asbestos removal if required; removing existing redundant equipment, debris, and obsolete parts; installation of new isolation valves and drain off cocks; installation of a hydraulic board (containing heat meter spacer piece, direct hot water heat exchanger and system balancing/commissioning equipment); modifying pipework to accept hydraulic board and to serve existing radiators and existing hot and cold water pipework; installation of all necessary temperature controls, programmer, room thermostat, check valves, strainers, drain cocks etc. plus commissioning; associated wiring; insulating concealed pipework in cupboards etc.; all making good and associated and incidental work. Externally the work comprises: Installation of new isolation valves to individual blocks for heating incoming supplies; installation of new heating circulation pumps. The Contractor will be required to carry out all liaison functions with tenants and residents to ensure the works are completed in accordance with the stipulated timescales, including: Tenant liaison, information reporting and resolution of tenant queries/ complaints/problems.
CPV-Code: 45351000
Abgabefrist:
Typ: Contract award
Status: Not applicable
Aufgabe: General public services
Vergabestelle:
name: Sheffield City Council
address: 2 - 10 Carbrook Hall road,
postal_code: S9 2DB
city: Sheffield - UK
country: UK
email: None
phone: +44 1142735412
contact_point: Design and Project Management
idate: 13. Juni 2020 09:08
udate: 13. Juni 2020 09:08
doc: 004881_2011.xml
authority_types: REGIONAL_AUTHORITY
activities: GENERAL_PUBLIC_SERVICES
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:004881-2011:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: Lowest price
Vertrag: Works
Prozedur: Accelerated restricted procedure
Nuts: UK
Veröffentlichung: 07.01.2011
Erfüllungsort: Sheffield - UK
Link:
Lose:
Name Los Nr 1 Community heating phase 2 - installation of control equipment.
Gewinner Lovell Respond
Datum
Wert GB£4 899 300,84
Anzahl Angebote 6