Increase Denox Efficiency HRC at AEB Amsterdam

The method of interpretation of the measurement uncertainty for emission measurements is expected to be adjusted in Q3 2018. The new measurement uncertainty still has to be determined, but is probably 25 % of the legally established measurement inaccuracy for the monthly averages. The measured values ​​of the NOx emission of the HRC, i.e. K35 and K36 invariably exceeds the new legally set monthly norm value. To solve this problem, the DENOX installation must be adapted and the entire package: consultancy, engineering, delivery and installation and commissioning must be put out to tender. The reason for this is that AEB itself does not have the knowledge to do preliminary research with sufficient depth to determine the scope and write a specification. For this tender the BVP (Best Value Procurement) methodology is used which is expected to have the best chance of finding the supplier that will deliver the best total solution(s).
CPV-Code: 42320000
Abgabefrist: 01.04.2019
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Other
Vergabestelle:
name: AEB Amsterdam
address: Australiëhavenweg 21
postal_code: 1045 BA
city: Amsterdam - NL
country: NL
email: None
phone: +31 205876193
contact_point: Haidy Hankers
idate: 11. Juni 2020 04:12
udate: 11. Juni 2020 04:12
doc: 022976_2019.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:022976-2019:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 17.01.2019
Erfüllungsort: Amsterdam - NL
Link:
Lose:
Name Los Nr 1 Netherlands__Amsterdam__Abfallverbrennungsöfen
Gewinner None
Datum
Wert None
Anzahl Angebote None