Fish Friendly Retrofit of 2 Vertical Kaplan Hydroturbines.

Retrofit of 2 Kaplan vertical hydro turbines in order achieve power plant life-time extension while complying with fish-friendly hydrodynamic characteristics. Since 1950's, EDFL is operating a cascade of 6 low head, run-off river hydro power plants along the River Meuse, in Belgium. Among those plants, the Monsin power station (1954) needs rehabilitation works. Plant is now equipped with 3 full Kaplan units, 5,6 m diameter of the runner. Performance is 6,5 MWe per unit, under a maximum gross head of 5,7m and flow 131 m³/sec. Scope of works is the replacement of 2 units (turbine & generator) within the existing civil works by minimizing the concrete structure modifications.
CPV-Code: 42112200
Abgabefrist: 15.03.2017
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Electricity
Vergabestelle:
name: EDF Luminus SA
address: Markiesstraat 1
postal_code: 1000
city: Brussels - BE
country: BE
email: None
phone: +32 22134891
contact_point:
idate: 29. Juni 2020 17:15
udate: 29. Juni 2020 17:15
doc: 036465_2017.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:036465-2017:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: BE332
Veröffentlichung: 31.01.2017
Erfüllungsort: Brüssel - BE
Link:
Lose:
Name Los Nr 1 Belgium__Brüssel__Wasserturbinen
Gewinner None
Datum
Wert None
Anzahl Angebote None