005/0279/17 Design Supply, Installation, Commissioning and Maintenance Support of Wheel Rail Adhesion Sanding Systems for NIR Enter…

Translink is the main public transport provider in Northern Ireland and is made up of three companies: Metro, Ulsterbus, and Northern Ireland Railways (NIR). NIR operates a fleet of 23 CAF Class 3 000 units and 20 CAF Class 4 000 units. NIR also operates in partnership with Irish Rail, 4 "Enterprise" units. These comprise De-Dietrich coaches powered with a GM 201 class locomotive. While carriages of the train are equipped with Wheel Slide Prevention (WSP) equipment currently the train is not equipped with any form of wheel rail adhesion enhancing sanding systems for either traction or braking. A turnkey project is required to design, supply and install wheel rail adhesion enhancing sanding systems under braking on 2 carriages of each Enterprise train set during 2017 (total of 8 systems). The sanding systems must operate in conjunction with the KBRS sanding system being installed on the Class 201 locomotive.
CPV-Code: 34630000
Abgabefrist:
Typ: Contract award notice
Status: Not applicable
Aufgabe: Urban railway / light rail, metro, tramway, trolleybus or bus services
Vergabestelle:
name: Translink
address: Milewater Road
postal_code: BT3 9BG
city: Belfast - UK
country: UK
email: None
phone: None
contact_point: neil.bowerstranslink.co.uk
idate: 20. Juni 2020 09:58
udate: 20. Juni 2020 09:58
doc: 038121_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:038121-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: Lowest price
Vertrag: Services
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 26.01.2018
Erfüllungsort: Belfast - GB
Link:
Lose:
Name Los Nr 1 None
Gewinner None
Datum
Wert None
Anzahl Angebote None