IIntrabay Doors and Floor Valves

The ESS is one of the world's largest scientific and technology infrastructure projects being constructed today, currently under construction to the north east of Lund (Sweden). It will include a waste processing plant known as the active cells. The required works form an integral part of the active cells perimeter. It is therefore required that these works perform as part of the perimeter confinement and radiation boundary such that the works will act to ensure that radioactive particles and radiation within the active cells do not pose a hazard to people and the environment. The Contractor shall design manufacture deliver install and commission (including all required testing, verification and documentation) the following: — active cell upper and lower intrabay doors, — active cell floor valve 2 off, — active cell component transfer hatch, — actuating mechanisms, drives and low level control systems.
CPV-Code: 44421500
Abgabefrist:
Typ: Contract award notice
Status: Not applicable
Aufgabe: Other
Vergabestelle:
name: United Kingdom Atomic Energy Authority
address: Culham Centre for Fusion Energy
postal_code: OX14 3DB
city: Abingdon - UK
country: UK
email: None
phone: +44 1235468035
contact_point: Rob Harries-Harris
idate: 2. Juli 2020 23:53
udate: 2. Juli 2020 23:53
doc: 057106_2019.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:057106-2019:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Competitive procedure with negotiation
Nuts: None
Veröffentlichung: 06.02.2019
Erfüllungsort: Abingdon - GB
Link:
Lose:
Name Los Nr 2 None
Gewinner IDOM Engineering, Architecture and Consulting S.A.U.
Datum
Wert GB£4 803 897,72
Anzahl Angebote 7
Name Los Nr 1 None
Gewinner IDOM Engineering, Architecture and Consulting S.A.U.
Datum
Wert GB£987 108,10
Anzahl Angebote 7