Design and build of NB power supply building (B 34) and NB high voltage power supply building (B 37), the fast discharge and switch…

The ITER project aims to build a fusion device twice the size of the largest current devices with the goal of demonstrating the scientific and technical feasibility of fusion power. The fusion reactor is being constructed in Europe, at Cadarache in the south of France. F4E is responsible for providing the infrastructure and for housing the various components necessary for the Tokamak as well as providing some equipment. All this work is divided up into Tender Batches (TB). This procurement procedure is related to TB12: Design and build contract including design, construction, test & commissioning and taking-over by F4E of the neutral beam power supply buildings (Buildings 34 and 37) the fast discharge & switching networks resistor building (Building 75) as well as the design activities of the control building (Building 71). Precise description is to be found in the procurement documents.
CPV-Code: 45210000
Abgabefrist: 03.04.2018
Typ: Additional information
Status: Submission for all lots
Aufgabe: Other
Vergabestelle:
name: The European Joint Undertaking for ITER and the development of Fusion Energy (“Fusion for Energy”)
address: C/ Josep Pla 2 Torres Diagonal Litoral Edificio B3
postal_code: 08019
city: Barcelona - ES
country: ES
email: None
phone: +34 933201800
contact_point: Contract and Procurement Unit for the attention of Audrey Verpont
idate: 2. Juli 2020 03:35
udate: 2. Juli 2020 03:35
doc: 082284_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:082284-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Competitive procedure with negotiation
Nuts: None
Veröffentlichung: 23.02.2018
Erfüllungsort: Barcelona - ES
Link:
Lose:
Name Los Nr 1 Spain__Barcelona__
Gewinner None
Datum
Wert None
Anzahl Angebote None