Söderenergi AB is renewing the Line 1 at Igelstaverket. The line was originally built as a 120MW coal powder fired boiler with steam drum and was in 1997 converted by Noell to a grate fired boiler and is now operated at approx. 80MW.
The line mainly use combination of SRF waste and plastics for the car industry as a fuel.
This contract outlines three problem areas that needs modifications:
1. Internal fuel handling
2. High combustion temperature
3. The grate
| CPV-Code: |
90513300
|
| Abgabefrist: |
12.04.2018 |
| Typ: |
Contract notice |
| Status: |
Submission for all lots |
| Aufgabe: |
Production, transport and distribution of gas and heat |
| Vergabestelle: |
| name: |
Söderenergi AB |
| address: |
None |
| postal_code: |
|
| city: |
Södertälje - SE |
| country: |
SE |
| email: |
None |
| phone: |
None |
| contact_point: |
Nicklas Stavström |
| idate: |
2. Juli 2020 01:22 |
| udate: |
2. Juli 2020 01:22 |
| doc: |
085871_2018.xml |
| authority_types: |
|
| activities: |
|
|
| Quelle: |
http://ted.europa.eu/udl?uri=TED:NOTICE:085871-2018:TEXT:EN:HTML |
| Unterlagen: |
None |
| Zuschlagskriterium: |
The most economic tender |
| Vertrag: |
Works |
| Prozedur: |
Negotiated procedure |
| Nuts: |
None |
| Veröffentlichung: |
24.02.2018 |
| Erfüllungsort: |
Södertälje - SE |
| Link: |
|
| Lose: |
| Name |
Los Nr 1 Sweden__Södertälje__
|
| Gewinner |
None |
| Datum |
|
| Wert |
None |
| Anzahl Angebote |
None |
|