Norrenergi AB is presently preparing a general modernization of Solnaverket to achieve a completely fossil free heat production. The first step in the modernization is to substitute the existing district heating heavy fuel oil fired boiler P3 from 1969 that is considered to have reached its lifetime. The new boiler P3 should be a 70 MW wood powder fired boiler with bio oil as alternative fuel and fossil gas oil as reserve fuel. The delivery is a turnkey contract.
| CPV-Code: |
42515000
|
| Abgabefrist: |
10.03.2020 |
| Typ: |
Contract notice |
| Status: |
Submission for all lots |
| Aufgabe: |
Production, transport and distribution of gas and heat |
| Vergabestelle: |
| name: |
Norrenergi Aktiebolag |
| address: |
Box 1177 |
| postal_code: |
17123 |
| city: |
Solna - SE |
| country: |
SE |
| email: |
None |
| phone: |
None |
| contact_point: |
Johanna Stålered |
| idate: |
24. Juni 2020 13:22 |
| udate: |
24. Juni 2020 13:22 |
| doc: |
097743_2020.xml |
| authority_types: |
|
| activities: |
|
|
| Quelle: |
http://ted.europa.eu/udl?uri=TED:NOTICE:097743-2020:TEXT:EN:HTML |
| Unterlagen: |
None |
| Zuschlagskriterium: |
The most economic tender |
| Vertrag: |
Supplies |
| Prozedur: |
Negotiated procedure |
| Nuts: |
None |
| Veröffentlichung: |
27.02.2020 |
| Erfüllungsort: |
Solna - SE |
| Link: |
|
| Lose: |
| Name |
Los Nr 1 Sweden__Solna__Fernwärmekessel |
| Gewinner |
None |
| Datum |
|
| Wert |
None |
| Anzahl Angebote |
None |
|