Pellets boiler Täby.

A turnkey contract regarding a 6 MW boiler fuelled by wooden pellets. The pellets could also be of industrial quality. The boiler will be fitted into an existing building. The boiler will work as a single production unit as well as a unit together with other boilers in the same plant and even in the complete district heating system. The boiler should be built to meet the requirements as a 72h periodic monitoring (AFS2002:1(§17 och § 18)). The boiler shall be equipped with an industrial control system which should be able to connect to a parenting system. The boiler shall be built as a hot water boiler (110 °C) and have construction pressure on the boiler PN10/150 °C. Requirements regarding combustion properties. Environmental value, NOX (10 min. mean) 50 mg/MJ. Environmental value, CO (10 min. mean). 120 mg/MJ. Environmental value, Dust (ndg vid 13 % CO2) (10 min. mean) 20 mg/m3ndg.
CPV-Code: 42160000
Abgabefrist: 04.05.2015
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Production, transport and distribution of gas and heat
Vergabestelle:
name: MCK Energiteknik AB
address: Karlsbodavägen 18, Bromma
postal_code: 168 67
city: Stockholm - SE
country: SE
email: None
phone: +46 705212201
contact_point:
idate: 2. Juli 2020 09:20
udate: 2. Juli 2020 09:20
doc: 120821_2015.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:120821-2015:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Supplies
Prozedur: Negotiated procedure
Nuts: SE110
Veröffentlichung: 04.04.2015
Erfüllungsort: Stockholm - SE
Link:
Lose:
Name Los Nr 1 Sweden__Stockholm__Kesselanlagen
Gewinner None
Datum
Wert None
Anzahl Angebote None