Boiler Energy Improvement Programme for Schools (V1).

As part of the authority's drive to become more fuel efficient, the Boiler Energy Improvement Programme for Schools is required in order to deliver energy efficiency savings across the whole education estate. We require installation of a solution that will make a range of boilers more efficient by reducing boiler energy use. The education estate, comprises of a combination of Secondary, Special and Primary schools in Hampshire. Boilers across the estate consist of a variety of boiler types, old and new of varying sizes and fuels. The intention is to improve fuel efficiency across the entire estate by at least 10 %, with payback on the initial investment in a maximum of 10 years. The aspiration is to provide energy efficiency improvements to all suitable boilers at each individual school site. The successful applicant will be the supplier that is able to carry out the programme to increase boiler energy efficiency across the greatest number of schools at the highest rate of savings. The estate comprises 1852 Boilers total output is approximately 210, 800 KW. Total number of schools in the programme is approximately 500. As a minimum requirement of this contract at least 70 % of schools in the programme must be covered by the winning solution. As this is key to the successful implementation of the programme, failure to attain coverage on any less than 70 % of schools will result in the failure of the tender to proceed further. There are approximately 400 primary schools, 26 special schools and 90 secondary schools with a combined total of approximately 1852 boilers. Applicant's will also fail to proceed further in the tender if questions pertaining to Selection Criteria do not result in a pass mark being attained. (Please see ITT documentation for details of pass/fail questions in the Selection Criteria)>. The Authority expects that in fulfilment of this requirement the successful solution should offer a range of benefits or attributes such as: — Provides demonstrable fuel efficiencies. — Retrofitable. — Transferable where boiler replacement occurs. — Transferable where fuel conversions occur. — Maintain a default boiler operation if the solution fails. — Easy to maintain – low cost / no maintenance. — Suitable for single or multiple boiler installations. — Simple to operate. — Simple to install. — Indicate operational mode (run/fail). — Interface with all existing boiler controls (including BEMS). — Maintain boiler sequencing.
CPV-Code: 44621221
Abgabefrist: 06.07.2012
Typ: Contract notice
Status: Submission for all lots
Aufgabe: General public services
Vergabestelle:
name: Hampshire County Council
address: Three Minsters House, Winchester High Street
postal_code: SO23 8UL
city: Winchester - UK
country: UK
email: None
phone: None
contact_point: Mr. Ian Pearce via:- https://in-tendhost.co.uk/hampshire
idate: 12. Juni 2020 15:20
udate: 12. Juni 2020 15:20
doc: 160200_2012.xml
authority_types: REGIONAL_AUTHORITY
activities: GENERAL_PUBLIC_SERVICES,EDUCATION
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:160200-2012:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Supply contract
Prozedur: Open procedure
Nuts: UKJ3
Veröffentlichung: 22.05.2012
Erfüllungsort: Winchester - UK
Link:
Lose:
Name Los Nr 1 UK__Winchester__Teile von Heizkesseln für Zentralheizungen
Gewinner None
Datum
Wert None
Anzahl Angebote None