Full Turnkey Solution (Wrap)

The NeuConnect interconnector will be the first UK to Germany interconnector. It will connect and facilitate power between the UK transmission system at the Isle of grain and the German transmission system near Wilhelmshaven. The interconnector, which is sized at 1400MW (receiving end) to take advantage of proven design and technology, has a cable route of approximately 720 km that routes through UK, Netherlands and German territorial waters before making landfall at either end. It comprises of 2 bundled cables of equal size and capacity intended to operate at opposite polarity in a pure bi-pole configuration. At the UK end the land route is less than 2 km whilst on the German side there is a route of approximately 18 km to the converter site. Whilst there may be a multi-supplier solution for the cable, it is envisaged that there will need to be a single survey, maintenance, emergency response and repair contract for the entire length of the cable for a term of 25 years.
CPV-Code: 31230000
Abgabefrist: 17.05.2019
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Electricity
Vergabestelle:
name: NeuConnect Britain Ltd and NeuConnect Deutschland GmbH
address: 105 Piccadilly
postal_code: W1J 7NJ
city: London - UK
country: UK
email: None
phone: None
contact_point: Steve Sudlow
idate: 19. Juni 2020 18:57
udate: 19. Juni 2020 18:57
doc: 173835_2019.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:173835-2019:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: None
Veröffentlichung: 12.04.2019
Erfüllungsort: London - GB
Link:
Lose:
Name Los Nr 1 United Kingdom__London__Teile von Elektrizitätsverteilungs- oder -schalteinrichtungen
Gewinner None
Datum
Wert None
Anzahl Angebote None