Works on Bezdan lock and Šebešfok sluice and lock within the Complex water management development of the area of the Baja-Bezdan Ca…

The subject is works on reconstruction and reparation of Bezdan lock and works on reparation and upgrade of warehouse and adaptation of Šebešfok lock. All works will be realized at 2 locations in West Backa District, AP Vojvodina, according to Serbian law. First group of works is Reconstruction of the chamber, heads, pre-ports, double doors, auxiliary shaft closures, portal crane, lock lighting, semaphore signalization, earthing installation, electric shock protection, cable distribution on Bezdan lock. Second group of works is Reparation of the chamber, heads, concrete parts, underwater walls, wild vegetation removal, double door gates, gate wings, weir stop logs and their mechanism, portal crane and Moisture protection and upgrading of the facility — a command center, parking space, electricity supply, automation cabinet, control panel, visual inspection system, semaphores, water level measuring system on Šebešfok lock.
CPV-Code: 45248100
Abgabefrist: 29.06.2018
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Environment
Vergabestelle:
name: Public water management company Vode Vojvodine Novi Sad
address: Bulevar Mihajla Pupina 25
postal_code: 21000
city: Novi Sad - RS
country: RS
email: None
phone: +381 214881430
contact_point: Stevan Ilincic
idate: 18. Juni 2020 23:26
udate: 18. Juni 2020 23:26
doc: 188959_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:188959-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: Lowest price
Vertrag: Works
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 28.04.2018
Erfüllungsort: Novi Sad - RS
Link:
Lose:
Name Los Nr 1 Serbia__Novi Sad__
Gewinner None
Datum
Wert None
Anzahl Angebote None