Northumberland Energy Park (Phase 1)

Further information will be provided in the Selection Questionnaire (SQ) and Invitation to Negotiate (ITN) documents however in summary, the scheme consists of, but is not limited to, site clearance and removal of vegetation, topsoil and hard standing ground remediation as necessary, of the localised soils and groundwater’s. Removal of relic structures: Construction of a deep berth extension of the ash barge dock to allow vessels with a draft of up to 9,0 m to use the berth. Formation of a new piled quay wall on land, excavating existing soils between the new wall and existing wall and breaking out existing relic structures and finally removing the existing quay wall. Dredging with suitable batters formed between the dredge pockets and the tidal basin and a 10 m wide open quay structure formed at the rear of the existing dock using tubular steel piles. Construction of a new open quay structure to the landward end of the existing ash barge dock.
CPV-Code: 45244000
Abgabefrist: 15.06.2018
Typ: Additional information
Status: Submission for all lots
Aufgabe: General public services
Vergabestelle:
name: Arch Corporate Holdings Ltd
address: 15 Evolution, Wynyard Park
postal_code: TS22 5TB
city: Wynyard - UK
country: UK
email: None
phone: +44 1740665466
contact_point: Mr Stephen Leyland
idate: 13. Juni 2020 00:28
udate: 13. Juni 2020 00:28
doc: 212758_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:212758-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Competitive procedure with negotiation
Nuts: None
Veröffentlichung: 18.05.2018
Erfüllungsort: Wynyard - GB
Link:
Lose:
Name Los Nr 1 United Kingdom__Wynyard__
Gewinner None
Datum
Wert None
Anzahl Angebote None