Construction of Elevated Structures

Construction of elevated structures (viaduct and stations) of length 7.50 Km (approx.) from Gottigere to Swagath Road Cross (Chainage 00.00 m to 7501.818 m) including Kothnur Depot entry line, Road widening and allied works and 5 Numbers of Metro Stations viz, Gottigere, Hulimavu, IIMB, JP Nagar 4th Phase, Swagath Road Cross in Reach-6 line of Bangalore Metro Rail Project, Phase-2 – Balance Works.
CPV-Code: 45221122
Abgabefrist: 21.05.2021
Typ: Additional information
Status: Submission for all lots
Aufgabe: Other
Vergabestelle:
name: Bangalore Metro Rail Corporation Ltd
address: BMTC Complex, 3rd Floor, K.H. Road, Shanthinagar
postal_code: 560 027
city: Bengaluru - IN
country: IN
email: None
phone: +91 8022969222
contact_point: General Manager — Contracts
idate: 1. Mai 2021 12:37
udate: 1. Mai 2021 12:37
doc: 213115_2021.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:213115-2021:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: Lowest price
Vertrag: Works
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 30.04.2021
Erfüllungsort: Bengaluru -
Link:
Lose:
Name Los Nr 1
Gewinner None
Datum
Wert None
Anzahl Angebote None