Solar Photovoltaic Farm Frameworks

The Contracting Authority, wishes to put in place a Framework Agreement with a suitably qualified contractor (hereafter referred to as the ‘Contractor’) to act on behalf of the Contracting Authority in developing a 7,500kWp minimum Solar Photovoltaic (PV) plant within the Dublin Airport campus to provide on-site renewable electricity to Dublin Airport. The project is currently at concept stage. The Contracting Authority requires a partner to design, build, operate, and maintain the proposed solar photovoltaic plant at Dublin Airport , as described in Part 4 (Scope), and other associated works as required by the Contracting Authority.
CPV-Code: 45235100
Abgabefrist: 19.05.2022
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Airport-related activities
Vergabestelle:
name: daa plc
address: Dublin Airport
postal_code: Co Dublin
city: Dublin - IE
country: IE
email: None
phone: None
contact_point: Brian Collier
idate: 24. April 2022 08:26
udate: 24. April 2022 08:26
doc: 213723_2022.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:213723-2022:TEXT:EN:HTML
Unterlagen: http://irl.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=211054&B=ETENDERS_SIMPLE
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: None
Veröffentlichung: 22.04.2022
Erfüllungsort: Dublin -
Link:
Lose:
Name Los Nr 1 Ireland__Dublin__Bauarbeiten für Flughäfen
Gewinner None
Datum
Wert None
Anzahl Angebote None