Orkdal Municipality shall establish a new water supply from Steinshaugen. 3 ground water wells have been established and shall be expanded. The following shall be constructed: a new water treatment plant, a local waste water plant, transfer system for drinking water to the new elevated basin at Digerås before connecting to the existing water supply system at Fannrem. This contract — E09 — applies to the fourth stage of the transfer system from Brekka to Kvammen. The entire project will be carried out as joint projects with start up at different dates throughout the construction period of approx. 2 and a half years. The remaining contracts, E07-E08 will be announced consecutively. Contract E09 includes the controlled drilling in loose deposits and the delivery/pull-in of: — approx. 250 m Ø400 mm water main, — approx. 250 m Ø125 mm conduits for cables.
| CPV-Code: |
45232000
|
| Abgabefrist: |
|
| Typ: |
Contract award notice |
| Status: |
Not applicable |
| Aufgabe: |
General public services |
| Vergabestelle: |
| name: |
Orkdal kommune, Tekniske tjenester |
| address: |
Allfarveien 5, Postboks 83 |
| postal_code: |
7301 |
| city: |
Orkanger - NO |
| country: |
NO |
| email: |
None |
| phone: |
+47 73483000 |
| contact_point: |
Bjørn Idar Ekren |
| idate: |
27. Juni 2020 23:41 |
| udate: |
27. Juni 2020 23:41 |
| doc: |
214359_2019.xml |
| authority_types: |
|
| activities: |
|
|
| Quelle: |
http://ted.europa.eu/udl?uri=TED:NOTICE:214359-2019:TEXT:EN:HTML |
| Unterlagen: |
None |
| Zuschlagskriterium: |
The most economic tender |
| Vertrag: |
Works |
| Prozedur: |
Competitive procedure with negotiation |
| Nuts: |
None |
| Veröffentlichung: |
08.05.2019 |
| Erfüllungsort: |
Orkanger - NO |
| Link: |
|
| Lose: |
| Name |
Los Nr 1 None |
| Gewinner |
Steg Entreprenør AS |
| Datum |
|
| Wert |
2 036 250,00 Nkr |
| Anzahl Angebote |
2 |
|