Floor Valve and Intrabay doors

The ESS is one of the world's largest scientific and technology infrastructure projects being constructed today, currently under construction to the north east of Lund (Sweden). It will include a waste processing plant known as the Active Cells. The required Works form an integral part of the Active Cells perimeter. It is therefore required that these works perform as part of the perimeter confinement and radiation boundary such that the Works will act to ensure that radioactive particles and radiation within the Active Cells do not pose a hazard to people and the environment. The Contractor shall design manufacture deliver install and commission (including all required testing, verification and documentation) the following: — active Cell Upper and Lower Intrabay Doors, — active Cell Floor Valve 2 off, — active Cell Component Transfer Hatch, — actuating mechanisms, drives and low level control systems.
CPV-Code: 44421500
Abgabefrist: 03.07.2018
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Other
Vergabestelle:
name: United Kingdom Atomic Energy Authority
address: Culham Science Centre
postal_code: OX14 3DB
city: Abingdon - UK
country: UK
email: None
phone: +44 1235468035
contact_point: Rob Harries-Harris or Paula Barham
idate: 3. Juli 2020 15:41
udate: 3. Juli 2020 15:41
doc: 214812_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:214812-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Competitive procedure with negotiation
Nuts: None
Veröffentlichung: 19.05.2018
Erfüllungsort: Abingdon - GB
Link:
Lose:
Name Los Nr 1 United Kingdom__Abingdon__
Gewinner None
Datum
Wert None
Anzahl Angebote None