TBO — Hydraulic Packer Tests

Part of the deep borehole project (TBO project) is the assessment of the barrier properties of the formation Opalinus Clay and its confining geological units, as well as the characterisation of the deep aquifers by means of hydraulic packer tests. The performance of hydraulic packer tests, including their analysis and documentation, is the subject of this tender. The depth of the hydraulic packer tests is expected to range between 30 – 1400 m. Nagra wishes to award 2 contracts, each for hydraulic packer testing in 3 successive boreholes. Each Contract has the option for extension of hydraulic packer testing in 3 additional successive boreholes. Most boreholes will be vertical, however, a few inclined boreholes are also possible. The following work items are requested: — provision of hydraulic packer-test equipment, — performance of hydraulic packer tests, — groundwater sampling (pumping, downhole sampling), — test analysis, — documentation (reports).
CPV-Code: 76470000
Abgabefrist: 13.07.2018
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Other
Vergabestelle:
name: Nagra
address: Hardstrasse 73, Postfach 280
postal_code: 5430
city: Wettingen - CH
country: CH
email: None
phone: None
contact_point: A&V / Hydraulic Packer Tests / Do not open
idate: 24. Juni 2020 17:51
udate: 24. Juni 2020 17:51
doc: 238704_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:238704-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Services
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 02.06.2018
Erfüllungsort: Wettingen - CH
Link:
Lose:
Name Los Nr 1 Switzerland__Wettingen__
Gewinner None
Datum
Wert None
Anzahl Angebote None