In readiness for remobilization, PPP Services are looking to ensure that the project is ready to recommence as soon as is possible and safe to do so. To that end, PPP Services (SRP) will shortly be releasing an HVAC ECI ITT based on the following: A brief indication of the requirement. • provide technical review of BIM ductwork design to engineering team to optimise detailed design trade pack information for forward Design for Manufacture and Assembly (DfMA). • start date mid June 2020 (tbc) If you are keen to express an interest in this scope, please let me know by no later than 12.00 noon 28 May 2020 to start the process.
| CPV-Code: |
71241000
|
| Abgabefrist: |
|
| Typ: |
Prior information notice without call for competition |
| Status: |
Not applicable |
| Aufgabe: |
Other |
| Vergabestelle: |
| name: |
Morgan Sindall Construction and Infrastructure Ltd |
| address: |
Allday House, Warrington Road, Birchwood |
| postal_code: |
WA3 6AU |
| city: |
Warrington - UK |
| country: |
UK |
| email: |
None |
| phone: |
None |
| contact_point: |
Lynda Hadfield |
| idate: |
23. Juni 2020 07:21 |
| udate: |
23. Juni 2020 07:21 |
| doc: |
245082_2020.xml |
| authority_types: |
|
| activities: |
|
|
| Quelle: |
http://ted.europa.eu/udl?uri=TED:NOTICE:245082-2020:TEXT:EN:HTML |
| Unterlagen: |
None |
| Zuschlagskriterium: |
Not applicable |
| Vertrag: |
Services |
| Prozedur: |
Not applicable |
| Nuts: |
None |
| Veröffentlichung: |
26.05.2020 |
| Erfüllungsort: |
Warrington - GB |
| Link: |
|
| Lose: |
| Name |
Los Nr 1 United Kingdom__Warrington__Durchführbarkeitsstudie, Beratung, Analyse |
| Gewinner |
None |
| Datum |
|
| Wert |
None |
| Anzahl Angebote |
None |
|