LP2 and LP3 Feedwater Heater Replacement Lough Ree Power Station

Lough Ree Power is a 100MWe peat fired CFB power plant. Amongst the feed water heaters employed on the water steam cycle are three vertical high pressure (HP) feed water heaters and 3 horizontal low pressure (LP) heaters. ESB plan to replace one of the HP heaters due to flow accelerated corrosion damage to its shell and internal tubing. ESB also plan to replace two LP heaters due to repeated tube leaks also. ESB invites expressions of interest for the design, manufacture, delivery, installation and commissioning of a new high pressure feed water heater at Lough Ree Power. The works will include removal of the existing heater.
CPV-Code: 42164000
Abgabefrist: 21.06.2018
Typ: Contract notice
Status: Submission for one lot only
Aufgabe: Electricity
Vergabestelle:
name: Electricity Supply Board (ESB)
address: 2 Gateway
postal_code: East Wall Road
city: Dublin 3 - IE
country: IE
email: None
phone: +353 876731421
contact_point: Greg Dooley
idate: 30. Juni 2020 01:41
udate: 30. Juni 2020 01:41
doc: 246863_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:246863-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Supplies
Prozedur: Negotiated procedure
Nuts: None
Veröffentlichung: 08.06.2018
Erfüllungsort: Dublin - IE
Link:
Lose:
Name Los Nr 1 Ireland__Dublin__
Gewinner None
Datum
Wert None
Anzahl Angebote None