LTE-VN24&25: Life Time Extension of the Stacks of assets VN24&25.

Nuon location Velsen consists of two power plants, Velsen 24 and Velsen 25. Both units have an output of approximately 360 MW(e). Unit VN24 is built in 1973 and Unit VN25 is built in 1986. The units are planned to run until 2026 with unit VN25 in base load and unit VN24 in spare activities. Therefore we are currently running the Life Time Extension program ‘Easter’. The Stacks' sizes are approximately: @x@x@m
CPV-Code: 45262330
Abgabefrist: 01.09.2014
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Electricity
Vergabestelle:
name: https://login.commerce-hub.com/index.cfm?fuseAction=__requestBook.description&_kid=A060F089-12658
address: Hoflaan 1
postal_code: 1951 HJ
city: Velsen-Noord - NL
country: NL
email: None
phone: +31 652533328
contact_point:
idate: 21. Juni 2020 12:46
udate: 21. Juni 2020 12:46
doc: 263137_2014.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:263137-2014:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: NL323
Veröffentlichung: 01.08.2014
Erfüllungsort: Velsen-Noord - NL
Link:
Lose:
Name Los Nr 1 Netherlands__Velsen-Noord__Betonreparaturarbeiten
Gewinner None
Datum
Wert None
Anzahl Angebote None