TBO — Long-term Monitoring Systems

Part of the deep borehole project (TBO project) is the installation of multi-packer long-term monitoring systems to measure the hydraulic head (groundwater level and groundwater pressure) of designated formations as well as to take groundwater samples from selected deep aquifers. Nagra wishes to award one contract for the supply and installation of multi-packer long-term monitoring systems in three vertical TBO boreholes including reporting. The contract has the option for extension for additional TBO boreholes. A minimum of seven observation intervals per borehole is planned and their depth is expected to range between approx. 100 – 1200 m. The following work items are requested: — supply of multi-packer systems (stand pipe system) including all downhole and surface equipment as well as data acquisition systems, — installation of all equipment parts in three selected TBO boreholes, — planning and mobilisation report, — installation report.
CPV-Code: 76490000
Abgabefrist: 03.08.2020
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Other
Vergabestelle:
name: Nagra
address: Hardstrasse 73, Postfach 280
postal_code: 5430
city: Wettingen - CH
country: CH
email: None
phone: None
contact_point: A&V George Wewerka/Long-term monitoring systems/Do not open
idate: 1. Juli 2020 04:12
udate: 1. Juli 2020 04:12
doc: 287869_2020.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:287869-2020:TEXT:EN:HTML
Unterlagen: http://www.simap.ch/shabforms/servlet/Search?NOTICE_NR=1140595
Zuschlagskriterium: The most economic tender
Vertrag: Services
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 19.06.2020
Erfüllungsort: Wettingen - CH
Link:
Lose:
Name Los Nr 0
Gewinner None
Datum
Wert None
Anzahl Angebote None
Name Los Nr 1 Switzerland__Wettingen__Bohrloch-Komplettierung
Gewinner None
Datum
Wert None
Anzahl Angebote None