New oil fired district heating boiler for Farsta.

The Farsta district heating plant was built in the late 50's and is today serving as a peak load plant. Fortum plans to replace the existing boilers in the plant with 1 new oil fired boiler, HOB. The new boiler will be fired with light fuel oil No 1 (EO1). It shall also be designed for the possibility of firing Bio oil RME in the future. The boiler shall be directly connected to the district heating system. An economizer is not foreseen. Circulation through the boiler for the purpose of minimum flow and inlet water temperature shall be made with a separate circulation pump. The boiler is expected to be directly fired, without a flue gas fan. Combustion air shall be a mixture of indoor and outdoor air. No flue gas filter is foreseen initially.
CPV-Code: 42515000
Abgabefrist: 07.10.2016
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Extraction of gas and oil
Vergabestelle:
name: AB Fortum Värme samägt med Stockholms stad
address: Kvicksundsvägen 16
postal_code: 124 59
city: Bandhagen - SE
country: SE
email: None
phone: +46 73-0571500
contact_point: David Rona
idate: 20. Juni 2020 18:43
udate: 20. Juni 2020 18:43
doc: 314534_2016.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:314534-2016:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Supplies
Prozedur: Negotiated procedure
Nuts: SE110
Veröffentlichung: 10.09.2016
Erfüllungsort: Bandhagen - SE
Link:
Lose:
Name Los Nr 1 Sweden__Bandhagen__
Gewinner None
Datum
Wert None
Anzahl Angebote None