Balbriggan Water Supply Phase 1 (SLI) Network and Reservoir.

Summary of main elements. Watermains. Description Location Length (m). 450 mm Diameter 2313 400 mm Diameter 1123 300 mm Diameter 879 200 mm Diameter 180 All proposed watermains are underground Ductile Iron. Other pipework. The Reservoir Scour Pipe consists of 300 mm-diameter concrete pipe gravity drain 680 m in length. Foul and surface water drainage to the Reservoir and Pumping Station sites comprises 1 131 m of 225 mm-diameter concrete pipe gravity drain. Reservoir. The proposed reservoir is of the order of 6 000 m3. Pumping station. The Pumping Station and 450 mm-diameter Rising Main is designed to deliver 150 l/s in Stage 1. Two vertically installed pumps are proposed, to operate in duty/stand-by arrangement.
CPV-Code: 45247270
Abgabefrist:
Typ: Contract award
Status: Not applicable
Aufgabe: General public services
Vergabestelle:
name: Fingal County Council
address: PO Box 174, Fingal County Hall, Main Street
postal_code:
city: Swords - IE
country: IE
email: None
phone: +353 18905000
contact_point: Water Services
idate: 11. Juni 2020 01:09
udate: 11. Juni 2020 01:09
doc: 341206_2011.xml
authority_types: REGIONAL_AUTHORITY
activities: GENERAL_PUBLIC_SERVICES
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:341206-2011:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Accelerated restricted procedure
Nuts: IE021
Veröffentlichung: 02.11.2011
Erfüllungsort: Swords -
Link:
Lose:
Name Los Nr 1 Balbriggan Water Supply Phase 1 (SLI) Network and Reservoir.
Gewinner Jons Civil Engineering Co. Ltd.
Datum
Wert None
Anzahl Angebote 6