Electrical contracts relating to Bord Gáis Éireann wind farm development.

It is anticipated that the applicants can provide all services outlined in this section. 2.1 Bord Gáis wind farms. It is anticipated that the proposed electrical works and grid connection works relating to wind farm developments that may be procured by Bord Gáis Éireann (or a subsidiary of Bord Gáis Éireann under the framework will be at various locations throughout Ireland and Northern Ireland and comprise the construction of a significant number of wind turbines between the projects, including all necessary electrical works, cabling, site compounds, substation buildings and grid connection contestable works. 2.2 Electrical works. The anticipated scope of electrical works applicable to the framework includes but is not limited to the detail engineering, design, procurement, installation, testing, pre-commissioning, energisation, and commissioning of the following works: — Grid connection transformer, — Switchgear, — Reactive power compensation equipment, — MV collector system, — Protection control systems and relays, — Substation ancillary equipment, — Lightning protection, — Earthing, — Fibre optic network, — Metering, — Signals and interface, — Substation civil works. The anticipated scope of electrical works associated with renewable projects also includes but is not limited to preliminaries, site compounds, health and safety, security, traffic management, compliance with planning, ESB & Eirgrid, other service providers, other contractors, landowners conditions associated with each project. 2.3 Grid connection works. The anticipated scope of grid connection works applicable to the framework includes but is not limited to the following works: — Contestable grid connection works: electrical and civil design, procurement, installation, testing, pre-commissioning, energisation, and commissioning to include substation works, overhead line works, underground cable works to meet ESB & Eirgrid standards and specifications to connect each project to the national grid. The anticipated scope of grid connection works associated with renewable projects also includes but is not limited to preliminaries, site compounds, health and safety, security, traffic management, compliance with planning, ESB & Eirgrid standards, other service providers, other contractors, landowners conditions associated with each project. Note: To register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=330412.
CPV-Code: 31214120
Abgabefrist: 29.11.2011
Typ: Contract notice
Status: Not specified
Aufgabe: Production, transport and distribution of gas and heat
Vergabestelle:
name: Bord Gáis Éireann
address: Third Floor, City Quarter, Lapps Quay
postal_code:
city: Cork - IE
country: IE
email: None
phone: +353 214907284
contact_point: Energy Procurement
idate: 15. Juni 2020 23:59
udate: 15. Juni 2020 23:59
doc: 344985_2011.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:344985-2011:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: IE
Veröffentlichung: 03.11.2011
Erfüllungsort: Cork -
Link:
Lose:
Name Los Nr 1 IRL__Cork__Erdungsschalter
Gewinner None
Datum
Wert None
Anzahl Angebote None