Design and Build of NB Power Supply Building (B34) and NB High Voltage Power Supply Building (B37), the Fast Discharge and Switching Networks Resisto…

The ITER project aims to build a fusion device twice the size of the largest current devices with the goal of demonstrating the scientific and technical feasibility of fusion power. The fusion reactor is being constructed in Europe, at Cadarache in the south of France. F4E is responsible for providing the infrastructure and for housing the various components necessary for the Tokamak as well as providing some equipment. All this work is divided up into Tender Batches (TB). This procurement procedure is related to TB12: — design and build contract including design, construction, test and commissioning and Taking-Over by F4E of the neutral beam power supply buildings (buildings 34 and 37), — the fast discharge and switching networks resistor building (building 75) as well as, — the design activities of the control building (building 71).
CPV-Code: 45210000
Abgabefrist:
Typ: Contract award notice
Status: Not applicable
Aufgabe: Other
Vergabestelle:
name: The European Joint Undertaking for ITER and the development of Fusion Energy (‘Fusion for Energy’)
address: C/ Josep Pla 2 Torres Diagonal Litoral Edificio B3
postal_code: 08019
city: Barcelona - ES
country: ES
email: None
phone: None
contact_point: Romain Guidez
idate: 3. Juli 2020 23:37
udate: 3. Juli 2020 23:37
doc: 348936_2019.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:348936-2019:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Competitive procedure with negotiation
Nuts: None
Veröffentlichung: 25.07.2019
Erfüllungsort: Barcelona - ES
Link:
Lose:
Name Los Nr 1 None
Gewinner Demathieu Bard Construction S.A.S
Datum
Wert 87 001 214,43 €
Anzahl Angebote 3