Runway 10/28 rehabilitation, AGL infrastructure upgrade works, associated runway access improvements and associated works.

Traffic movements at Dublin Airport increased by over 70 % in the years 1990 - 2008, since the drop in traffic due to the global recession in 2009 traffic has been increasing steadily. Runway Infrastructure including AGL Infrastructure is in need of refurbishment and replacement, and runway capacity by means of runway line up points and other associated projects, the refurbished and new facilities must facilitate the forecast increase in traffic. The Contracting Authority proposes to engage a multi-disciplinary design consultant to prepare detailed feasibility studies for these projects, prepare outline designs and prepare further designs/employers requirements documents to facilitate the procurement, construction and commissioning of these significant infrastructure projects at Dublin Airport.
CPV-Code: 71322000
Abgabefrist: 17.11.2014
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Airport-related activities
Vergabestelle:
name: Dublin Airport Authority plc ( DAA )
address: Dublin Airport
postal_code:
city: Dublin - IE
country: IE
email: None
phone: None
contact_point:
idate: 19. Juni 2020 12:52
udate: 19. Juni 2020 12:52
doc: 358196_2014.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:358196-2014:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Service contract
Prozedur: Negotiated procedure
Nuts: IE
Veröffentlichung: 21.10.2014
Erfüllungsort: Dublin - IE
Link:
Lose:
Name Los Nr 1 Ireland__Dublin__Technische Planungsleistungen im Tief- und Hochbau
Gewinner None
Datum
Wert None
Anzahl Angebote None