Campbeltown New Quay Expansion.

Campbeltown New Quay has been used for the shipping of locally manufactured wind turbine components since 2005 and now the manufacturing facility is being enlarged to enable fabrication of larger components. The shipping of these new, larger components requires the use of larger, deeper draughted vessels and to accommodate these vessels the seabed at the inner berth of the New Quay is to be lowered by approximately 3 m. A new quay wall is required for this deeper water. Works are also required at the Old Quay to widen the road to allow the wind turbine component to be transported to the New Quay. The New Quay will be extended by installation of a new steel sheet and tubular combination ‘combi’ pile wall of approximately 140m in length directly in front of the existing solid and open quay structures. The seabed at the inner berth will be lowered by the dredging of approximately 50,000 tonnes of material. Scour protection mattresses will be installed below water adjacent to the slipway and at the Old Quay. The new pile wall will be tied back to the existing structure and fill will be placed in the void between the old and new pile walls. Ladders, fenders, bollards and cathodic corrosion protection will be installed. The existing reinforced concrete open deck will be widened and partially overlaid and new reinforced concrete capping beams and quay deck ground slabs will be provided as well as area lighting, water points, gates and fencing. The reclamation works at the Old Quay will require the infill of approximately 500 m2 of the harbour and partial realignment of the upper sections of the adjacent masonry harbour wall. The reclamation will be protected from the sea by a sloped precast concrete block revetment. These works will include realigned roadway, paved oversteer areas, footpath, drainage, services and road markings. Argyll and Bute Council is appointing a Principal Contractor for the performance of the works described above based on a design by Argyll and Bute Council’s appointed consultants, URS/Scott Wilson.
CPV-Code: 45244000
Abgabefrist:
Typ: Contract award
Status: Not applicable
Aufgabe: General public services
Vergabestelle:
name: Argyll and Bute Council
address: 1A Manse Brae,
postal_code: PA31 8RD
city: Lochgilphead - UK
country: UK
email: None
phone: +44 1546604881
contact_point: Development and Infrastructure Services
idate: 9. Juni 2020 19:21
udate: 9. Juni 2020 19:21
doc: 376829_2011.xml
authority_types: REGIONAL_AUTHORITY
activities: GENERAL_PUBLIC_SERVICES
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:376829-2011:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Restricted procedure
Nuts: UKM3
Veröffentlichung: 03.12.2011
Erfüllungsort: Lochgilphead - UK
Link:
Lose:
Name Los Nr 1 Campbeltown New Quay Expansion.
Gewinner Bam Nuttall Ltd
Datum
Wert None
Anzahl Angebote 5