Kriegers Flak Combined Grid Solution (KF CGS) 150 kV 3 core submarine cable including transport, laying and installation.

The scope of work includes, in particular, design, production, delivery, execution and completion of 2 x 25 km 3 core 150 kV Submarine Cable including: — Transport and laying of the 150 kV Submarine Cables; — Pull-in onto Kriegers Flak E (KFE) and Baltic 2 platforms; — Delivery and installation of end-terminations for the cables on the KFE and Baltic 2 platforms and — Related services. The transfer capability for each Submarine Cable is supposed to be at least 200 MW (steady load). The contracting entity reserves the right to increase the transfer capability of each cable to be at least 225 MW (steady load). The relevant details will be specified in the tender documents.
CPV-Code: 31321500
Abgabefrist: 18.11.2015
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Production, transport and distribution of gas and heat
Vergabestelle:
name: 50 Hertz Transmission GmbH
address: Eichenstraße 3a
postal_code: 12435
city: Berlin - DE
country: DE
email: None
phone: +45 70102244
contact_point:
idate: 30. Juni 2020 13:09
udate: 30. Juni 2020 13:09
doc: 383751_2015.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:383751-2015:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Supplies
Prozedur: Negotiated procedure
Nuts: DK
Veröffentlichung: 30.10.2015
Erfüllungsort: Fredericia - DK
Link:
Lose:
Name Los Nr 1 Denmark__Fredericia__Tiefseekabel
Gewinner None
Datum
Wert None
Anzahl Angebote None