Fishguard Port Linkspan Replacement.

The proposed development includes 2 main elements of work; firstly the removal of linkspan ramps, associated mechanical infrastructure and the demolition of the concrete approach and support structures to facilitate the installation of the new linkspan. The second element of work, the design and installation of the new linkspan, includes all marine civil works required to facilitate the installation of the new linkspan. This included the construction of new dolphins and bank-seat and the installation of a new linkspan,. An area of land, immediately adjacent to the quay wall, will be reclaimed and faced with a rock armour revetment to replace the existing suspended approach deck. The provision, installation and commissioning of the linkspan ramps and associated mechanical infrastructure will complete the project. The full Project Description is outlined within the Pre-Qualification Information and Selection Questionnaire (PQI&SQ).
CPV-Code: 45244000
Abgabefrist: 06.11.2017
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Port-related activities / Maritime or inland waterway
Vergabestelle:
name: RPS Group
address: Elmwood House, 74 Boucher Road
postal_code: BT12 6RZ
city: Belfast - UK
country: UK
email: None
phone: None
contact_point: Les Stracey
idate: 20. Juni 2020 03:46
udate: 20. Juni 2020 03:46
doc: 396758_2017.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:396758-2017:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: None
Veröffentlichung: 07.10.2017
Erfüllungsort: Holyhead - GB
Link:
Lose:
Name Los Nr 1 United Kingdom__Holyhead__
Gewinner None
Datum
Wert None
Anzahl Angebote None