High Speed Switches and Crossings Development

Current S&C designs product accepted for use on Network Rail infrastructure have a maximum turnout speed limited to 90 mph. Other infrastructure managers (including the UK-based HS1 Ltd) have S&C in day-to-day operation with higher turnout speeds and it is recognised that it will be beneficial to UK rail industry for Network Rail also to have S&C equipment with this higher turnout speed capability. The need for this capability has been highlighted by High Speed 2 (HS2). The planned HS2 infrastructure includes a number of connections to Network Rail routes and, to maximise benefits (journey times and capacity), it will be advantageous for HS2 services to run from/to network rail infrastructure at the existing network through route line speed. This will not be possible if turnout speeds are limited to 90 mph. The Network Rail Technical Authority have been asked by the HS2 Integration Team within System Operator to scope the work required to introduce Switches and Crossings (S&C) design.
CPV-Code: 31214100
Abgabefrist:
Typ: Prior information notice without call for competition
Status: Not applicable
Aufgabe: Other
Vergabestelle:
name: Network Rail Infrastructure Ltd
address: 1 Eversholt Street
postal_code: NW1 2DN
city: London - UK
country: UK
email: None
phone: +44 7732642192
contact_point:
idate: 1. September 2020 04:22
udate: 1. September 2020 04:22
doc: 397470_2020.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:397470-2020:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: Not applicable
Vertrag: Supplies
Prozedur: Not applicable
Nuts: None
Veröffentlichung: 24.08.2020
Erfüllungsort: London - GB
Link:
Lose:
Name Los Nr 1
Gewinner None
Datum
Wert None
Anzahl Angebote None