Signalling and Telecomms Design and Build Contractor.

The Project involves the design and construction of a new signalling and telecomms system, by a Signalling and Telecomms Design and Build Contractor. The project is a re-signalling scheme for the Coleraine to Derry Londonderry Railway Line in Northern Ireland. A Route Relay Interlocking system is to be designed and constructed along the 33,5 mile long single line route. The Signalling and Telecomms Infrastructure for a new Passing Loop is to be designed and constructed in the vicinity of Bellarena Station. The Signalling and Telecomms Infrastructure for new Engineering Sidings will be designed and constructed in the vicinity of Bellarena Station also. There are currently three signal boxes on this route. All signalling control is to be consolidated into the Coleraine Signal Box and the existing signal cabins at Castlerock Station and at Derry Londonderry Station will be closed under this scheme. The Bann Bridge in Coleraine has a central bascule span. The control and detection associated with this lifting span is to be designed and constructed by the Economic Operator. This includes the interlocking of the lifting controls with the Signalling and Telecomms system on the Coleraine to Derry Londonderry Railway Line. The appointed Economic Operator will be responsible for the design and construction of all the Signalling and Telecomms Infrastructure on the Coleraine to Derry Londonderry Railway Line. A number of User Worked Crossings along this railway line have warning times below those recommended in the Railway Safety Principles Guidance. Under this project, the arrangements at the User Worked Crossings will be made compliant with the Railway Safety Principles Guidance document by the provision of designed Signalling and Telecomms solutions. The anticipated design period is from March 2013 until March 2014. The anticipated construction period is from March 2014 until March 2015. Throughout the construction period, the timetabled train services will operate on the Coleraine to Derry Londonderry Railway Line. The majority of construction activities will take place during overnight engineering possessions in “Green Zones” supplemented by some daytime works in “Red Zones”. Estimated value: The estimated value, excluding VAT, of the project is in the cost range of GBP 13,000,000 to GBP 17,000,00. Form of contract: An NEC3 Form of contract shall be used for this Project. Full details of the contract conditions shall be set out in the invitation to tender documents. Full details of the contract will be set out in the Invitation to Tender Documents. The Translink Group is utilising an electronic tendering system to manage this procurement and communicate with Tenderers. Accordingly, it is intended that all communications with the Translink Group including the accessing and submission of PQQ responses will be conducted via www.e-sourcingni.bravosolution.co.uk To participate in this requirement you should click on the above link and access the Pre Qualification Questionnaire documents from eSourcing NI. The title of this requirement in the “View Current Opportunities” section of eSourcing NI is the same as that displayed here.
CPV-Code: 45234115
Abgabefrist: 04.02.2013
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Railway services
Vergabestelle:
name: Translink
address: 3 Milewater Road
postal_code: BT3 9BG
city: Belfast - UK
country: UK
email: None
phone: +44 2890354029
contact_point:
idate: 10. Juni 2020 18:30
udate: 10. Juni 2020 18:30
doc: 411413_2012.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:411413-2012:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: UKN0
Veröffentlichung: 27.12.2012
Erfüllungsort: Belfast - UK
Link:
Lose:
Name Los Nr 1 UK__Belfast__Arbeiten für Eisenbahnsignalanlagen
Gewinner None
Datum
Wert None
Anzahl Angebote None