Wet Heating Domestic System Installation

Remove any existing heating system including storage heaters, multi-point water heaters, back boilers, gas wall heaters and any associated pipe work and make good. This excludes gas and electric warm air heaters that must not be removed due the risk of asbestos. (This clause does not apply for the installation only of new heating systems). This is a general comment and must be included in the surveyors report/survey. Install a Vaillant Eco Tec Sustain 28 ERP Condensing Combination Boiler or a Worcester Bosch Junior 30i ERP or an Ideal Logic 30 ERP (to include external filling loop) in a position agreed with the customer. The type of boiler is dependent on the percentage agreed in the contract by employers agent.
CPV-Code: 45331110
Abgabefrist: 30.09.2020
Typ: Contract notice
Status: Submission for all lots
Aufgabe: General public services
Vergabestelle:
name: Bristol City Council
address: City Hall, College Green
postal_code: BS1 5TR
city: Bristol - UK
country: UK
email: None
phone: None
contact_point: Ms Carrie Pearson
idate: 1. Oktober 2020 01:24
udate: 1. Oktober 2020 01:24
doc: 417090_2020.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:417090-2020:TEXT:EN:HTML
Unterlagen: https://procontract.due-north.com/Advert/Index?advertId=38035b58-d2e7-ea11-8104-005056b64545
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 04.09.2020
Erfüllungsort: Bristol -
Link:
Lose:
Name Los Nr 1
Gewinner None
Datum
Wert None
Anzahl Angebote None