HØK — Renewal of CHP plant — Helsingør.

Helsingør Kraftvarmeværk A/S is operating a gas-fired combined cycle plant at the site of Energivej 19 in Helsingør. A decision has been made to renew the existing plant by establishing a biomass-fired boiler at the site. The existing turbine condensers (district heating) to the existing steam turbine (combined cycle) will be utilised for the new steam turbine. Only one steam turbine will be in operation at a time. It will not be possible to run combined cycle plant and bio boiler plant in parallel. The combined cycle plant will mainly be used as a back-up. The new biomass fired plant will consist of a boiler unit with flue gas cleaning and flue gas condensation. There will be a power output of 62 MW (steam flow 20,8 kg/s). Nominal design data will be 500°C/64 bar(g). The scope of the inquiry will cover a steam turbine, generator and gearbox within the specified battery limits.
CPV-Code: 42112100
Abgabefrist: 27.01.2017
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Electricity
Vergabestelle:
name: Sweco AB
address: Box 2909
postal_code: 212 09
city: Malmö - SE
country: SE
email: None
phone: +46 706541994
contact_point: Kjell Manhag
idate: 28. Juni 2020 21:54
udate: 28. Juni 2020 21:54
doc: 455235_2016.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:455235-2016:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: DK021
Veröffentlichung: 23.12.2016
Erfüllungsort: Helsingør - DK
Link:
Lose:
Name Los Nr 1 Denmark__Helsingør__
Gewinner None
Datum
Wert None
Anzahl Angebote None