Tamar Bridge Kerb Unit and Deck Waterproofing Remedial Work

With the aim being to undertake work during the Spring of 2019, this preferred start date is intended to allow for all kerb fixings and corrosion remedial works to be completed, ahead of separate resurfacing work planned for 2020/21. Following close monitoring of the existing 7200 Kerb Units (4 studs per kerb unit) and the associated Deck Waterproofing System over recent years, since their initial installation, as part of the strengthening and widening scheme around the turn of the century, and following the identification of serious deterioration, a number of technical solutions were developed and tested and the preferred solution and range of activities required going forward is described as follows below in the Main Description.
CPV-Code: 45232451
Abgabefrist: 17.12.2018
Typ: Contract notice
Status: Submission for all lots
Aufgabe: General public services
Vergabestelle:
name: Plymouth City Council
address: Ballard House, West Hoe Road
postal_code: PL1 3BJ
city: Plymouth - UK
country: UK
email: None
phone: +44 1872322716
contact_point: Mr Mike Shillaber
idate: 30. Juni 2020 23:46
udate: 30. Juni 2020 23:46
doc: 463995_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:463995-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 23.10.2018
Erfüllungsort: Truro - GB
Link:
Lose:
Name Los Nr 1 United Kingdom__Truro__Entwässerungs- und Oberflächenarbeiten
Gewinner None
Datum
Wert None
Anzahl Angebote None