The installation of the export cable

The Project encompasses the design, manufacture, supply, installation and termination works of the export cable for the Northwester 2 Offshore Wind Farm. The export cable is a 225 kV 3 phase submarine cable and has an approximate length of 17 km. The Northwester 2 concession is located approximately 50 km in front of the coast of Zeebrugge, Belgium. The Wind Farm will have a total installed power of maximum 228 MW to be connected to the Modular Offshore Grid (MOG) of ELIA which will be operational in Q3 of 2019.
CPV-Code: 31321500
Abgabefrist: 22.12.2017
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Electricity
Vergabestelle:
name: Northwester 2
address: Sint-Maartenstraat 5
postal_code: 3000
city: Leuven - BE
country: BE
email: None
phone: +32 16240790
contact_point: Jan Dens
idate: 19. Juni 2020 15:20
udate: 19. Juni 2020 15:20
doc: 471539_2017.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:471539-2017:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: None
Veröffentlichung: 24.11.2017
Erfüllungsort: Löwen - BE
Link:
Lose:
Name Los Nr 1 Belgium__Löwen__
Gewinner None
Datum
Wert None
Anzahl Angebote None