New LBG plant at Tekniska verken i Linköping AB

The scope of supply includes a complete LBG plant consisting of among other things polish, liquefaction, storage and truck loading. Purpose and objectives: The purpose of this procurement is to reduce the emissions of carbon dioxide by increasing the biogas production as an alternative to fossil fuels. The objective with a new LBG plant is to reach new markets and thereby expand the biogas production. Scope: The scope of supply includes a complete LBG plant consisting of among other things polish, liquefaction, storage and truck loading. Please note that the size of the project is only an estimate and is non-binding. No division of the contract: P places great importance on obtaining a smooth-flowing total solution with only one (1) contractor who takes responsibility of the whole undertaking. This is the reason for not dividing up the contract.
CPV-Code: 45255800
Abgabefrist:
Typ: Contract award notice
Status: Not applicable
Aufgabe: Production, transport and distribution of gas and heat
Vergabestelle:
name: Tekniska verken i Linköping AB (publ)
address: Box 1500
postal_code: 58115
city: Linköping - SE
country: SE
email: None
phone: None
contact_point: Andreas Johansson
idate: 10. Juni 2020 09:41
udate: 10. Juni 2020 09:41
doc: 473575_2018.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:473575-2018:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Supplies
Prozedur: Negotiated procedure
Nuts: None
Veröffentlichung: 26.10.2018
Erfüllungsort: Linköping - SE
Link:
Lose:
Name Los Nr 1 None
Gewinner Wärtsilä Puregas Solutions AB
Datum
Wert 6 725 000,00 €
Anzahl Angebote 2