F 03 Demolition & In-situ Replacement of Al Lahun WWTP (Capacity of 5,500 m3/d)

The Scope of Works for this Contract is to (i) decommission the existing plant and demolish all existing structures of existing WWTP, except the existing headworks, existing effluent pumping station and existing effluent discharge pipeline, dismantle all existing electromechanical equipment and instruments (if any) and hand over to the Employer to be stored in the place within the border of allocated WWTP area, (ii) design and construct a new wastewater treatment plant with secondary treatment of an ultimate capacity of 5,500 m3/d, (iii) demolish the remaining existing units including existing headworks, effluent pumping station and effluent pipeline after completing the construction works of the WWTP and re-routing incoming forcemains to the new headworks, and (iv) to provide Operation and Maintenance Training for the Employer’s Staff and supervise the operation and maintenance of the WWTP during the Defects Notification Period.
CPV-Code: 45252127
Abgabefrist: 29.09.2022
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Other
Vergabestelle:
name: Holding Company for Water & Wastewater (HCWW)
address: Kornish El Nil - Rod El Farag, Rod El Farag Water Treatment Plant - El Sahel
postal_code: 11631
city: Cairo - EG
country: EG
email: None
phone: +20 01222481908
contact_point: Eng. Tarek BekhitE
idate: 2. September 2022 08:15
udate: 2. September 2022 08:15
doc: 475232_2022.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:475232-2022:TEXT:EN:HTML
Unterlagen: https://ecepp.ebrd.com/delta/viewNotice.html?displayNoticeId=18724735
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 02.09.2022
Erfüllungsort: Kairo -
Link:
Lose:
Name Los Nr 1 Egypt__Kairo__Bau von Abwasserbehandlungsanlagen
Gewinner None
Datum
Wert None
Anzahl Angebote None