HEV Lot 1 Flue Gas Condensing

Ørsted has decided to establish a flue gas condensing system at Herning power station (HEV) owned by Ørsted Bioenergy and Thermal Power A/S. The existing boiler plant at HEV both have a grate for wood chips firing and burners for wood pellet dust / gas firing. The design nominal thermal input is 263 MWth (130 MW wood chips, 133 MW wood pellets). The boiler has an ESP (electrostatic precipitator) and a flue gas fan of its own. The purpose of this project is to improve power plant efficiency by introducing a flue gas condensation system to utilize the heat in the hot flue gas.
CPV-Code: 42164000
Abgabefrist:
Typ: Contract award notice
Status: Not applicable
Aufgabe: Production, transport and distribution of gas and heat
Vergabestelle:
name: Ørsted Bioenergy and Thermal Power A/S
address: Kraftværksvej 53
postal_code: 7000
city: Fredericia - DK
country: DK
email: None
phone: +45 99555941
contact_point: Martin Grotrian
idate: 12. Juni 2020 17:31
udate: 12. Juni 2020 17:31
doc: 504360_2017.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:504360-2017:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Supplies
Prozedur: Negotiated procedure
Nuts: None
Veröffentlichung: 16.12.2017
Erfüllungsort: Fredericia - DK
Link:
Lose:
Name Los Nr 1 None
Gewinner None
Datum
Wert None
Anzahl Angebote None