HBS standard 3 upgrade - Baggage Handling System (BHS)

The Contractor is required to provide a Baggage Handling System (BHS) upgrade to facilitate the installation of ECAC Standard 3 EDS Machines (supplied and installed by others). The new machines will be installed in 3 locations: 4 machines in Bag Factory 2 3 machines in the Terminal 3 basement 2 machines in the Bag Factory 3 The existing BHS system will be modified as indicated by the tender drawings in order to accomplish the installation of these new machines, including a re-build of the existing system in Bag Factory 2. Moreover, the existing BHS shall be expanded into a new Western sortation facility (BFW) and associated tunnel connection.The project shall include all design work, conveyor equipment, steelwork, catwalks, walkways, impact protection, all electrical equipment, PLC programming, interface management, existing system modifications, coordination and commissioning efforts required to effectively accomplish a Design & Build BHS. The Contractor must provide a new HLC System.
CPV-Code: 34960000
Abgabefrist: 08.01.2018
Typ: Additional information
Status: Submission for all lots
Aufgabe: Airport-related activities
Vergabestelle:
name: Copenhagen Airports A/S
address: Lufthavnsboulevarden 6, Postbox 74
postal_code: 2770
city: Kastrup - DK
country: DK
email: None
phone: +45 53622054
contact_point: Beau Langston
idate: 24. Juni 2020 09:34
udate: 24. Juni 2020 09:34
doc: 513040_2017.xml
authority_types:
activities:
Quelle: http://ted.europa.eu/udl?uri=TED:NOTICE:513040-2017:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Negotiated procedure
Nuts: None
Veröffentlichung: 21.12.2017
Erfüllungsort: Kastrup - DK
Link:
Lose:
Name Los Nr 1 Denmark__Kastrup__
Gewinner None
Datum
Wert None
Anzahl Angebote None