Supplementary notice to notice 2021/S 131-349121 (Supplies) – Tender for Export Cable Design, Manufacture, Delivery, Termination and Testing for Poli…

This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. and Elektrownia Wiatrowa Baltica – 3 SP. Z o.o. 2021/S 131-349121 (Supplies). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entities' purchases in EU tender procedures. This notice relates to the contracting entities projects for the development, construction and operation of two offshore wind projects in the Baltic Sea with a total potential capacity of up to 2.5 GW where Ørsted Wind Power A/S is representing the Contracting Entities in the entire tender procedure (‘Entities represented by Ørsted Wind Power A/S’), specifically to the tender for Export Cable Design, Manufacture, Delivery, Termination and Testing for Polish Offshore Wind Farms — Baltica 3 and Baltica 2. Ørsted Wind Power A/S will use the Achilles UNCE qualification system for procurement and expects to launch the tender in the time between week 44-46 via said qualification system in using the product code 3.7.21
CPV-Code: 31321500
Abgabefrist:
Typ: Qualification system with call for competition
Status: Not applicable
Aufgabe: Electricity
Vergabestelle:
name: Achilles Information AS
address: PO Box 1817
postal_code: 4858
city: Arendal - NO
country: NO
email: None
phone: +47 37063530
contact_point: Mark Pless
idate: 1. November 2021 07:19
udate: 1. November 2021 07:19
doc: 525864_2021.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:525864-2021:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: The most economic tender
Vertrag: Supplies
Prozedur: Not applicable
Nuts: None
Veröffentlichung: 15.10.2021
Erfüllungsort: Warschau -
Link:
Lose:
Name Los Nr 1
Gewinner None
Datum
Wert None
Anzahl Angebote None