T 03 Qasr Rashwan (Contract B) Construction of Sewage networks and Pump stations for T.03 Villages

Works for the 1st Lot cover 5 villages located in the Tamia District cluster and consist construction of approx. 40 km. sewerage network, approx. 15 km of pipelines for forced mains, 160 m of waterway, and road crossings and 6 pumping stations, including supply and installations of all electromechanical equipment. The time for completion will be 24 months with 12 months of Defects Notification Period. Works for the 2nd Lot cover 8 villages located in the Tamia District and consist in the construction of approx. 92.75 km. sewerage network, approx. 17 km of pipelines for forced mains, 330 m of waterway, and road crossings and 6 pumping stations, including supply and installations of all electromechanical equipment. The time for completion will be 24 months with 12 months of Defects Notification Period.
CPV-Code: 45232423
Abgabefrist: 01.12.2022
Typ: Contract notice
Status: Submission for all lots
Aufgabe: Other
Vergabestelle:
name: Holding Company for Water & Wastewater (HCWW)
address: Kornish El Nil - Rod El Farag, Rod El Farag Water Treatment Plant - El Sahel
postal_code: 11631
city: Cairo - EG
country: EG
email: None
phone: +20 01222481908
contact_point: Eng. Tarek Bekhit
idate: 15. Oktober 2022 08:08
udate: 15. Oktober 2022 08:08
doc: 551544_2022.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:551544-2022:TEXT:EN:HTML
Unterlagen: https://ecepp.ebrd.com/respond/943J4A6RM4
Zuschlagskriterium: The most economic tender
Vertrag: Works
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 10.10.2022
Erfüllungsort: Kairo -
Link:
Lose:
Name Los Nr 1 Egypt__Kairo__Bau von Abwasserpumpstationen
Gewinner None
Datum
Wert None
Anzahl Angebote None