Enhancement of the operation of hydropower plant of Litani River Authority (LRA), Machgara,West Bekaa, Lebanon

The Abdel Al Hydropower Plant feeds the overall EDL grid in power and has a substation providing power to 93 villages in Bekaa and South Lebanon. The Abdel Al Hydropower Plant (MARKABI HPP) is the first hydropower plant on Litani River located in West Bekaa near the village of Machgara. Since 1962, its installed capacity is 2x18 MW and it is the master of the cascade of hydroelectric power Plants formed by the following power stations: MARKABI (2x18MW), AWALI (3x36 MW) and JOUN (2x24 MW). The Electric Protection System (EPS) is an essential component of the plant equipment. It consists of a series of electrical relays that protect the grid from electric shortcuts and damage. By time, the EPS is consumed and needs to be replaced to protect the plant from damage
CPV-Code: 42121200
Abgabefrist:
Typ: Contract award notice
Status: Not applicable
Aufgabe: General public services
Vergabestelle:
name: Council for Development & Reconstruction–CDR /Economic & Social Fund for Development– ESFD
address: None
postal_code: 11-1633
city: Beirut - LB
country: LB
email: None
phone: None
contact_point:
idate: 23. November 2021 09:14
udate: 23. November 2021 09:14
doc: 596329_2021.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:596329-2021:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: Lowest price
Vertrag: Supplies
Prozedur: Open procedure
Nuts: None
Veröffentlichung: 23.11.2021
Erfüllungsort: Beirut -
Link:
Lose:
Name Los Nr 1 None
Gewinner None
Datum
Wert None
Anzahl Angebote None