Selection of a shipyard and the Vessels' definition (by preparing a techno-economic assessment report) and determination of all necessary technical, financial and contractual requirements for the selected shipyard with which each Ship Owner will sign a contract (the ‘Contractor’), in the context of the Action entitled ‘BlueHUBS: LNG and CNG Supply Chains Upgrading Core TEN-T Ports in Eastern Mediterranean’, which is co-financed by the European Union (EU) under the Connecting Europe Facility in the field of transport (CEF-Transport), for the construction of two LNG bunkering vessels, one for DEPA and one for NAVIGAS, which will be registered at the ports of Piraeus and Limassol respectively, in order to establish the fundamental supply chain for the distribution of LNG to users in the ports of Piraeus, Heraklion, Limassol and other EU Ports in East Mediterranean Sea.
| CPV-Code: |
45000000
|
| Abgabefrist: |
20.01.2020 |
| Typ: |
Additional information |
| Status: |
Submission for all lots |
| Aufgabe: |
Production, transport and distribution of gas and heat |
| Vergabestelle: |
| name: |
Public Gas Corporation (DEPA) S.A |
| address: |
92, Marinou Antypa str. |
| postal_code: |
141 21 |
| city: |
Herakleion of Attica - GR |
| country: |
GR |
| email: |
None |
| phone: |
+30 2102701118 |
| contact_point: |
Ioanna Kombotiati, Procurement Director |
| idate: |
26. Juni 2020 09:23 |
| udate: |
26. Juni 2020 09:23 |
| doc: |
621350_2019.xml |
| authority_types: |
|
| activities: |
|
|
| Quelle: |
http://ted.europa.eu/udl?uri=TED:NOTICE:621350-2019:TEXT:EN:HTML |
| Unterlagen: |
None |
| Zuschlagskriterium: |
The most economic tender |
| Vertrag: |
Services |
| Prozedur: |
Negotiated procedure |
| Nuts: |
None |
| Veröffentlichung: |
30.12.2019 |
| Erfüllungsort: |
Herakleion of Attica - GR |
| Link: |
|
| Lose: |
| Name |
Los Nr 1 Greece__Herakleion of Attica__Mit der Gewinnung von Erdöl und Erdgas verbundene Dienstleistungen |
| Gewinner |
None |
| Datum |
|
| Wert |
None |
| Anzahl Angebote |
None |
|