Prior information notice - contract OB1 - Water and sewage installations (sea and land).

MOVAR shall expand Fuglevik treatment facility (RA) capacity wise for the future, and to include sewage water that is now cleaned at Kambo RA, which shall be reconstructed to a pre-treatment facility and pump station. MOVAR received a new discharge licence from the Manager in Oslo and Viken, where, from 2026, there will be a requirement for reduction of both phosphor, nitrogen and organic matter. The project is referred to as "Cleaner Oslofjord", and is again divided into two sub-projects «Nye Fuglevik Renseanlegg» and «Overføringsanlegg». The part-project «Overføringsanlegget» comprises laying an approx. 15 km long sewage pipeline from Brevik via Kambo and to Fuglevik Treatment Facility. This sea and land pipeline will run in Mossesundet, cross the infrastructure between Moss and Jeløy, and continue out in Værlebukta to Fuglevik RA. It also includes alterations to the current treatment facility at Kambo to a pump station, a new pump station at Brevik and renovation of Møllebakken pump station. This procurement, OB1 – Water and Sewage installations (sea and land) is one of three planned contracts in the sub-project 'The Transfer Facility'. The contract will be an execution contract in accordance with NS8405 and particularly applies to laying a transfer pipeline for sewage Brevik – Kambo – Fuglevik. The total route of approx. 14,750 m is divided into seven areas. A ready weighted submarine pipeline is planned to be used. The pipeline will lead sewage from Brevik and Cambodia to the new Fuglevik treatment facility. The pipeline dimensions and SDR classes are planned with ø450mm PE100 SDR13,6 from Brevik to Kambo, Ø710mm PE100 SDR13,6 from Kambo to Sjøbadet in Moss and Ø900mm PE100 SDR13,6 from Sjøbadet in Moss to landtak Fuglevik. Ø700mm cast iron pipes are used from landtake Fuglevik to RA Fuglevik. A new discharge pipeline shall be laid from the existing discharge foam by the beach at Fuglevik and up to 50 m water depth; Ø1200mm PE100 SDR17. The contract will include strict environmental requirements, including the considerations that must be taken for life in water and the general public use of the area, as well as requirements for taking into account the complexity of controlled drilling in the Moss Canal.
CPV-Code: 45231000 42996110 44130000 44160000 44161400 44161410 44163111 45231100 45231111 45231300 45232000 45232100 45232411 45232440 45232453 45332300
Abgabefrist:
Typ: PriorInformationNotice
Status: None
Aufgabe: None
Vergabestelle:
name: Movar Iks
address: Tykkemyr 2 Moss
postal_code: 1597
city: Moss - NO
country: NO
email: jorgen.myhre@foyen.no
phone: +47 40639860
contact_point: Jørgen Myhre +47 40639860 jorgen.myhre@foyen.no
idate: 4. Februar 2025 08:49
udate: 4. Februar 2025 08:49
doc:
authority_types:
activities:
Quelle: https://ted.europa.eu/de/notice/-/detail/00076226-2025
Unterlagen: https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=422827&B=
Zuschlagskriterium: None
Vertrag: None
Prozedur: None
Nuts: None
Veröffentlichung: 03.02.2025
Erfüllungsort: Moss - NO
Link:
Lose:
Name Los Nr 1 None
Gewinner None
Datum
Wert None
Anzahl Angebote None