Platfrom shelters

Light Rail Development is in the process of preparing for the procurement of the construction of the Light Rail construction stage 5 from Bergen city centre to Åsane. The fifth construction stage runs from the city centre through Åsane to Vågsbotn, together with a continual cycle route and an extension of the Fløyfjell tunnel to Eidsvåg. The line is planned to be realised in two construction stages. The first stage is approx. 2.5 km of double track from the city centre to Amalie Skrams Vei (Sandviken) with a possible opening in 2028. The next stage is approx. 10 kilometres of double track from Amalie Skrams Vei to Åsane, scheduled to open in 2033. This stage also includes a covered car park in Åsane. The light rail route is to be connected to the existing route in Kaigaten where a new stop will be established. The route then goes in Christies gate, Småstrandsgaten, Torget, Bryggen, and Sandbrogaten. From Sandrogaten the light rail route goes in a tunnel to Sandviken and a stop in rock by Sandviken church, then further towards Amalie Skrams vei.
CPV-Code: 45234129
Abgabefrist:
Typ: Periodic indicative notice without call for competition
Status: Not applicable
Aufgabe: Other
Vergabestelle:
name: Bybanen Utbygging
address: postboks 7900
postal_code: 5020
city: Bergen - NO
country: NO
email: None
phone: None
contact_point: Cecilie Thiis
idate: 21. November 2023 09:30
udate: 21. November 2023 09:30
doc: 705787_2023.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:705787-2023:TEXT:EN:HTML
Unterlagen: None
Zuschlagskriterium: Not applicable
Vertrag: Works
Prozedur: Not applicable
Nuts: None
Veröffentlichung: 21.11.2023
Erfüllungsort: Bergen -
Link:
Lose:
Name Los Nr 1 Norway__Bergen__Stadtbahnbauarbeiten
Gewinner None
Datum
Wert None
Anzahl Angebote None