EDW FSRU Phase 1 Beweissicherung Abwassereinleitung aus FSRU

Project Situation: The LNG import terminal in Wilhelmshaven currently under construction is planned to be operational on 23rd December 2022. The permitting process is ongoing subject to two main permits: 1. BImSchG (Immissions control act) and 2. WHG (water resources act). The water authority NLWKN requests a so-called baseline measurement until arrival of the FSRU which is planned 15th dec 2022. Project Targets: The water authority NLWKN has discussed a monitoring program with Uniper and its external consultant AquaEcology (AE). The efforts are related to the seawater treatment (with biocides) discharge of the same from the FSRU into the Jade river (North Sea). The scope of the monitoring program which consists of exhaustive water sampling and laboratory analyses as well as consultancy services and reporting has been fixed so far. Prior to start-up of the FSRU a baseline survey has to be carried out and monthly surveys with sampling have to be carried out. Goal is to proof in practi
CPV-Code: 71610000
Abgabefrist:
Typ: Contract award notice
Status: Not applicable
Aufgabe: Electricity
Vergabestelle:
name: Uniper Global Commodities SE
address: Holzstrasse 6
postal_code: 40219
city: Düsseldorf - DE
country: DE
email: None
phone: None
contact_point:
idate: 19. Dezember 2022 09:12
udate: 19. Dezember 2022 09:12
doc: 706343_2022.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:706343-2022:TEXT:DE:HTML
Unterlagen: None
Zuschlagskriterium: Lowest price
Vertrag: Services
Prozedur: Negotiated without a prior call for competition
Nuts: None
Veröffentlichung: 19.12.2022
Erfüllungsort: Düsseldorf -
Link:
Lose:
Name Los Nr 1 None
Gewinner Aquaecology
Datum
Wert None
Anzahl Angebote 4