Supervision of works on construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority meas…

This contract includes the following elements: 1.Sewerage network Construction of sewerage network in approximate length of 9.2 km. 2. Water supply priority measures Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. 3. Wastewater Treatment Plant Design and Construction of WWTP in Bakovići settlement - Conventional Activated Sludge Process and aerobic sludge stabilization. Design and construction of the WWTP shall include two phases: › Phase I – 4000 PE (to be constructed) › Phase II – additional 2000 PE (to be considered in design). Scope of the procurement is provision of the official review of the Detailed Designs for the WWTP and water supply priority measures and supervision of works on sewerage network, WWTP and water supply priority measures.
CPV-Code: 71520000
Abgabefrist:
Typ: Prior information notice without call for competition
Status: Not applicable
Aufgabe: General public services
Vergabestelle:
name: PROCON - LLC "PROJECT – CONSULTING
address: Buda Tomovića bb
postal_code: 84205
city: Podgorica - ME
country: ME
email: None
phone: +382 20865760
contact_point: Jadranka Novović
idate: 9. Dezember 2023 09:33
udate: 9. Dezember 2023 09:33
doc: 742919_2023.xml
authority_types:
activities:
Quelle: https://ted.europa.eu/udl?uri=TED:NOTICE:742919-2023:TEXT:EN:HTML
Unterlagen: https://www.opstinakolasin.me/
Zuschlagskriterium: Not applicable
Vertrag: Services
Prozedur: Not applicable
Nuts: None
Veröffentlichung: 08.12.2023
Erfüllungsort: Kolašin -
Link:
Lose:
Name Los Nr 1 Montenegro__Kolašin__Bauaufsicht
Gewinner None
Datum
Wert None
Anzahl Angebote None