Project Management and Engineering Design and Green Energy Management Systems

NWE is committed to a clean energy transition, but rapid renewable growth and electrification are straining grid capacity, leading to high costs due to congestion and curtailment. In 2023, redispatch measures in Germany alone cost 3.2 billion euro, with 19 TWh curtailed. The challenge is no longer generating renewable energy but using it efficiently. The rise of Energy Management Systems offer a smart grid solution that optimizes local electrification and renewables integration, something that business parks, which consume over 30 percent of energy in the region, have issues with. Specifically, the lack of organisational structure pose a risk to NWE's energy transition.
CPV-Code: 71323000 71318000 71321000 72224000 72212331
Abgabefrist: 19.06.2025
Typ: ContractNotice
Status: None
Aufgabe: None
Vergabestelle:
name: Nellcor PB Ireland
address: Michael Collins Rd, Murvue, Co. Galway Galway
postal_code: H91 W9N4
city: Galway - IE
country: IE
email: anthony.murphy15@medtronic.com
phone: +353 91402200
contact_point: +353 91402200 anthony.murphy15@medtronic.com
idate: 19. Mai 2025 08:04
udate: 19. Mai 2025 08:04
doc:
authority_types:
activities:
Quelle: https://ted.europa.eu/de/notice/-/detail/00319984-2025
Unterlagen: https://www.etenders.gov.ie/epps/cft/listContractDocuments.do?resourceId=5615395
Zuschlagskriterium: None
Vertrag: None
Prozedur: None
Nuts: None
Veröffentlichung: 18.05.2025
Erfüllungsort: Galway - IE
Link:
Lose:
Name Los Nr 1 None
Gewinner None
Datum
Wert 165 000,00 €
Anzahl Angebote None