Design and build Biogas Plant in Finnsnes, Norway.

The project involves the construction of a biogas plant in Finnsnes, Northern Norway, located adjacent to an existing waste-to-energy district heating facility. The plant will be designed to process approximately 65,000 tonnes of organic waste annually, including food waste, sewage sludge, fish waste, and similar feedstocks. The facility must produce biogas, with the final product being liquefied vehicle fuel. The selected contractor will be responsible for the design, engineering, construction, and commissioning of the biogas plant. The procurement process consists of several phases, starting with pre-qualification. It is recommended that suppliers interested in applying to participate begin by reading the uploaded documents "General Introduction" and "Tender Rules."
CPV-Code: 45255800 39100000 9110000 9120000 42113390 45222100 45250000 45255000 76000000
Abgabefrist: 17.02.2025
Typ: ContractNotice
Status: None
Aufgabe: None
Vergabestelle:
name: Rå Biopark AS
address: Bulldosarveien 271 Skibotn
postal_code: 9143
city: Skibotn - NO
country: NO
email: morten@avfallsmegling.no
phone: +47 91367773
contact_point: Morten Bangås +47 91367773 morten@avfallsmegling.no
idate: 15. Januar 2025 09:17
udate: 15. Januar 2025 09:17
doc:
authority_types:
activities:
Quelle: https://ted.europa.eu/de/notice/-/detail/00028833-2025
Unterlagen: https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=420775&B=
Zuschlagskriterium: None
Vertrag: None
Prozedur: None
Nuts: None
Veröffentlichung: 14.01.2025
Erfüllungsort: Skibotn - NO
Link:
Lose:
Name Los Nr 1 None
Gewinner None
Datum
Wert 25 000 000,00 €
Anzahl Angebote None